TOTAL POOL

TOTAL support for your commercial pool

  • Pool Services
    MAINTENANCE

    Plant Service & Maintenance


    Filter Inspections


    Filter refurbishments


    UV Supply & Service


    Plant Room Refurbishments


    Chemical Dosing & Control


    Balance Tank Cleaning


    Tiling & Grout Repair/Replacement


    Underwater Surveys and Repairs

    CHEMICALS

    Poolcure


    Pool Chemicals


    Water Testing

    MICRO-FILTRATION

    A REVOLUTIONARY CHANGE
    IN SWIMMING POOL
    FILTRATION

    Find out more …

    EGFM

    What is EGFM?


    EGFM Grades


    EGFM Production


    EGFM Technical


    EGFM Customers

    RESOURCES

    Pool Volume Calculator


    Dosing Calculator


    Health & Safety

  • Our Company

    About TOTAL POOL


    Contact Us


    Projects & Case Studies


    Terms & Conditions

Case studies

Please click on the case study link to open the study or to download it use a right click and choose ‘Save Link as’

Alvaston Hall Hotel, part of the Bourne Leisure Group decided to upgrade their pool filtration system. In the confined space of the plant room, the Ceramiflo filters easily replaced the 3-existing high-rate sand filters.Alvaston Hall case study
In 2017 examination of the main pool filter at Pontardawe Leisure Centre showed that it had reached the end of it’s useful
life and needed to be replaced. The problem was that there was no way that new steel or fibreglass filters could be got into
the plant room without major building work. The only access was down a narrow passageway
Pontardawe case study
The hydrotherapy pools in the Marselisborg Centre, Denmark, were built in 1999 equipped with sand filters, but faced with concerns over water quality and excessive water consumption, they required an alternative filtration systemMarselisborg case study
Ceramiflo was selected as the filtration system for the construction of a six-pool Olympic Swimming Centre – the largest public leisure centre in Norway – completed in 2013.Ankerskogen case study
Skive Water Park in Denmark were instructed to renovate their centre in order to meet the necessary requirements of modern day water parks. These renovations involved extending the filtration system to ensure supreme water quality, complying with
regulatory requirements.
Skive case study
When Ruthin Leisure Centre updated their filtration system, the old plant was isolated and remained in-situ while the new Ceramiflo system was installed nearby.Ruthin case study
Ceramiflo was installed at Stretford Sports Village to filter the main pool water in January 2020. The filters had previously been patch repaired but now one of the filters was offline due to more serious defects.Stretford case study
A site study of the impact of replacing a sand filtration system with the Ceramiflo, on the use of electricity, water and gas.Use of resources comparison

Total Pool Ltd
Unit 11, Pool Bank Business Park
High Street
Tarvin
Chester
CH3 8JH

Tel: 01829 740290
Email:
 sales@totalpool.co.uk

Registered in England No. 2168777
VAT Registration Number 482 298 612